Service 14 / 15
PDU
BURN TEST
Complete PDU burn-in testing services — verifying power distribution unit stability, load capacity, thermal performance, and reliability under sustained full-load conditions.
PDU Burn Testing subjects power distribution units to sustained full-load conditions over an extended period — verifying thermal stability, voltage regulation, current balance, and overall reliability before deployment.
Our engineers connect resistive load banks to each PDU output, monitoring temperature rise, voltage drop, current per phase, and any signs of overheating or instability throughout the burn-in duration.
Burn testing identifies manufacturing defects, weak components, and design issues before the PDU reaches the site — reducing downtime risk and ensuring reliable power distribution in critical facilities.
Sustained full-load testing of PDU outputs over extended duration to verify stability.
Temperature rise measurement at terminals, busbars, and internal components.
Continuous monitoring of voltage regulation and current balance per phase.
Resistive load bank connection to simulate real-world operating conditions.
Complete burn-in test reports with temperature, voltage, and current data logs.
Certification confirming PDU passed burn-in and is ready for deployment.
Identifies manufacturing defects before PDU reaches critical facility.
Confirms thermal performance under sustained maximum load conditions.
Proven reliability before installation reduces operational risk.
Attach load bank to PDU outputs.
Apply full load and monitor.
Log temperature and voltage.
Issue burn-in test report.
Share your testing requirements and our team will respond with a tailored plan within 24 hours.